Id
Want total control?Request access to start using the data. |
Organization
Want total control?Request access to start using the data. |
Roadwayname
Want total control?Request access to start using the data. |
Directionoftravel
Want total control?Request access to start using the data. |
Description
Want total control?Request access to start using the data. |
Reported
Want total control?Request access to start using the data. |
Lastupdated
Want total control?Request access to start using the data. |
Startdate
Want total control?Request access to start using the data. |
Plannedenddate
Want total control?Request access to start using the data. |
Lanesaffected
Want total control?Request access to start using the data. |
Geometry
Want total control?Request access to start using the data. |
Eventtype
Want total control?Request access to start using the data. |
Linkid
Want total control?Request access to start using the data. |
---|---|---|---|---|---|---|---|---|---|---|---|---|
MTO-constructions--2017-4023-201144168
|
MTO-constructions
|
Highway 401
|
Both Directions
|
Expect delays up to 10 minutes. Highway 401 - from Glen Miller Road (Interchange 526) to Highway 37 (Interchange 544) Traffic will encounter nightly lane closures Sunday to Thursday between 7:00 pm and 7:00 am. Traffic will encounter daily shoulder closures. Speeds reduced to 80 kilometres per hour. October 19, 2018 - October 26, 2018
|
2017-08-02 04:00:00
|
2018-10-19 16:00:02
|
2017-08-02 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-77.390086 44.194367)
|
roadwork
|
|
MTO-constructions--2018-4005-1113793027
|
MTO-constructions
|
Highway 417
|
Both Directions
|
Expect delays up to 5 minutes. Highway 417 - from 1.0 kilometre east of Barb Road (Interchange 17) to 1.5 kilometres west of McCrimmon Road (Interchange 35). Traffic will encounter single lane closures Monday to Saturday from 6:00 a.m. to 8:00 pm. Speeds reduced to 80 kilometres per hour. Effective width 4.25 metres. October 19, 2018 - October 26, 2018
|
2018-05-15 04:00:00
|
2018-10-19 16:00:02
|
2018-05-15 04:00:00
|
2019-11-15 05:00:00
|
No Data
|
POINT (-74.565028 45.517009)
|
roadwork
|
|
MTO-constructions--2017-2035-1614213144
|
MTO-constructions
|
Highway 401
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 401/403/410 Interchange in the geographic location of City of Mississauga. Possible full ramp closure on nights of October 25th and October 26th 2018 to Reconfigure ramp to stage 1A, north side of the ramp closure, 2 lanes of traffic shifted to south side of structure - possible nightly short term duration single lane closures for contract work or delivery of materials to site. October 19, 2018 - October 26, 2018
|
2018-04-06 04:00:00
|
2018-10-19 16:00:02
|
2018-04-06 04:00:00
|
2019-11-15 05:00:00
|
No Data
|
POINT (-79.660492 43.639308)
|
roadwork
|
|
MTO-constructions--2017-2036-1614213144
|
MTO-constructions
|
Highway 401
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 401/403/410 INTERCHANGE - Ramp Highway 401 Westbound Collector - Highway 403 Westbound, Ramp Highway 401 Westbound Collector - Highway 410 Northbound, Ramp Dixie North/South - Highway 401 Westbound Collector One (1) lane closure for 6 weeks starting from September 26, 2018 night on Dixie Road North/South to Highway 401 Westbound Collector ramp. October 19, 2018 - October 26, 2018
|
2018-05-02 04:00:00
|
2018-10-19 16:00:02
|
2018-05-02 04:00:00
|
2020-08-07 04:00:00
|
No Data
|
POINT (-79.660492 43.639308)
|
roadwork
|
|
MTO-constructions--2018-5120-680054935
|
MTO-constructions
|
Highway 17
|
Southbound
|
Expect delays up to 5 minutes. Highway 17 at the Coldwater River Bridge from 65.1 kilometres South of Highway 101 at Wawa. Occasional flagging may occur reducing Highway to one lane for short duration October 19, 2018 - October 26, 2018
|
2018-10-01 04:00:00
|
2018-10-19 16:00:02
|
2018-10-01 04:00:00
|
2019-11-26 05:00:00
|
No Data
|
POINT (-84.811859 47.491929)
|
roadwork
|
|
MTO-constructions--2015-2018-99038297
|
MTO-constructions
|
Highway 401
|
Both Directions
|
Expect delays up to 5 minutes. Highway 401 from East of Credit River to Highway 403/410 Interchange. 401 Eastbound (Express & Collectors), There will be 1 lane closures between Mississauga Road & Highway 410 from 22:00 to 5:00; and there will be 2 lane closures between Mississauga Road and Highway 410 from 22:00 to 5:00. 401 Westbound (Express & Collectors), There will be 1 lane closures between Highway 410 & Mississauga Road from 22:00 to 5:00; and there will be 2 lane closures between Highway 410 and Mississauga Road from 22:00 to 5:00. All on-ramps and off-ramps to 401 from Mavis Road or from Highway 10 may be closed 22:00 to 5:00 (only 1 ramp at a time). October 19, 2018 - October 26, 2018
|
2016-04-14 04:00:00
|
2018-10-19 16:00:02
|
2016-04-14 04:00:00
|
2020-08-06 04:00:00
|
No Data
|
POINT (-79.660492 43.639308)
|
roadwork
|
|
MTO-constructions--2017-5126-398263774
|
MTO-constructions
|
Highway 60
|
COMBINED
|
Expect delays up to 10 minutes. Highway 60 From 0.2 kilometres West of Kearney Creek Bridge, Easterly 27.4 kilometres to 0.2 Kilometres West of Highway 127. Lane closures will be in effect on Highway 60 within the limits of the project. Monday to Friday sunrise to sunset single lane closure operations controlled by traffic control persons. October 19, 2018 - October 26, 2018
|
2017-10-10 04:00:00
|
2018-10-19 16:00:02
|
2017-10-10 04:00:00
|
2018-10-19 04:00:00
|
No Data
|
POINT (-78.206358 45.491485)
|
roadwork
|
|
MTO-constructions--2015-4023-1833138951
|
MTO-constructions
|
Highway 28
|
COMBINED
|
Expect delays up to 5 minutes. Highway 28 - from Harley Road (Bancroft) to Renfrew Road 514. Traffic will encounter daily single lane closures with flagging. Speeds reduced to 60 kilometres per hour during flagging operations. Effective width 4.5 metres. October 19, 2018 - October 26, 2018
|
2016-03-01 05:00:00
|
2018-10-19 16:00:02
|
2016-03-01 05:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-77.440298 45.212572)
|
roadwork
|
|
MTO-constructions--2017-6030-1997170381
|
MTO-constructions
|
584
|
Northbound/All Directions
|
Expect delays up to 20 minutes. Murky Creek Bridge 45.6 kilometres North of Highway 11. Staged construction, one lane open. Reduced speed limit to 60 kilometres per hour. October 19, 2018 - October 26, 2018
|
2018-05-07 04:00:00
|
2018-10-19 16:00:02
|
2018-05-07 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-86.776894 50.038268)
|
roadwork
|
|
MTO-constructions--2017-6006-1708532848
|
MTO-constructions
|
Highway 599
|
Northbound/All Directions
|
Expect delays up to 5 minutes. On Highway 599, 15 kilometres South of New Osnaburg. Reduced to single lane controlled by traffic signals. Speed limit reduced to 60 kilometres per hour. Effective lane width of 3.34 metres. Height reduced to 5.0 metres at traffic signals. October 19, 2018 - October 26, 2018
|
2017-07-01 04:00:00
|
2018-10-19 16:00:02
|
2017-07-01 04:00:00
|
2018-10-26 04:00:00
|
No Data
|
POINT (-90.171653 51.127304)
|
roadwork
|
|
MTO-constructions--2017-2004-709529981
|
MTO-constructions
|
Highway 400
|
Southbound
|
Expect delays up to 10 minutes. Highway 400 / Highway 401 Interchange. Highway 400 Southbound to Black Creek Dr. closed Nightly October 15 to October 22. Follow D-2. Highway 400 Southbound 4 lanes closed nightly October 15 to October 20. Follow Highway 401 Westbound to Black Creek Dr. Ramp closed October 19 to October 22. Follow D-3 Highway 401 Eastbound to 400 Northbound ramps closed nightly October 15 to October 20. Follow D-4 highway 401 Westbound Collector 2 lane closure Nightly October 15 to October 20, 2018. Highway 401 Eastbound Express full closure nightly October 14 to October 15 and October 17 to October 18. Highway 401 Eastbound Express 2 lane closure nightly October 15 to October 20,2018. Closure date as per contractor schedule and dependent on Weather conditions. During closures, access to Highway 400 Northbound and Highway 400 Northbound ramp to follow Highway 401 East to D-7. October 19, 2018 - October 26, 2018
|
2017-05-31 04:00:00
|
2018-10-19 16:00:02
|
2017-05-31 04:00:00
|
2018-11-30 05:00:00
|
No Data
|
POINT (-79.518291 43.716502)
|
roadwork
|
|
MTO-constructions--2017-4001-1661154217
|
MTO-constructions
|
Highway 62
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 62 - Rawdon Creek Bridge - from 0.8 kilometres south of Wilson Road to 0.7 kilometres north of Ridge Road. Traffic will encounter daily single lane closures with flagging. Speeds reduced to 60 kilometres per hour during flagging operations. Effective lane width 4.0 metres. October 19, 2018 - October 26, 2018
|
2017-10-16 04:00:00
|
2018-10-19 16:00:02
|
2017-10-16 04:00:00
|
2018-11-28 05:00:00
|
No Data
|
POINT (-77.472483 44.330492)
|
roadwork
|
|
MTO-constructions--2017-5101-425424023
|
MTO-constructions
|
Highway 144
|
Northbound/All Directions
|
Expect delays up to 10 minutes. Whitson River Bridge Replacement, 20.6 kilometres North of Highway 17, VERMILION RIVER TRIBUTARY CULVERT Replacement, 4.5 Kilometres North of Whitson River, Canadian Pacific Railroad Bridge Rehabilitation, 26.1 Kilometres north of Highway 17 at Dowling and Highway 7044 Pump-House Creek Culvert Replacement, 6.7 kilometres South of North Entrance at Cartier. Traffic reduced to a single 3.5 metre lane on the CPR overhead structure Intermittent single lane closures throughout the contract limits for various operations. Temporary traffic signals will be in place until the end of Stage 2(estimate end of October 2018) October 19, 2018 - October 26, 2018
|
2017-06-05 04:00:00
|
2018-10-19 16:00:02
|
2017-06-05 04:00:00
|
2018-11-30 05:00:00
|
No Data
|
POINT (-81.213802 46.568949)
|
roadwork
|
|
MTO-constructions--2016-4005-278722063
|
MTO-constructions
|
Highway 401
|
Both Directions
|
Expect delays up to 10 minutes. Highway 401 Eastbound - from 4.9 kilometres east of Cliff Road to 4.6 kilometres east of Reynolds Road (Interchange 659). Highway 401 Westbound - from 5.8 kilometres west of Larue Mills Road to 1.5 kilometres west of Reynolds Road (Interchange 659). Traffic will encounter a long duration right lane closure Highway 401 Eastbound at Highway 137 until November 2018. Traffic may encounter single lane closures. Speeds reduced to 80 kilometres per hour. Effective width 4.5 metres, controlled by temporary concrete barriers. October 19, 2018 - October 26, 2018
|
2017-03-27 04:00:00
|
2018-10-19 16:00:02
|
2017-03-27 04:00:00
|
2019-06-21 04:00:00
|
No Data
|
POINT (-75.983141 44.382234)
|
roadwork
|
|
MTO-constructions--2017-2047-1450121791
|
MTO-constructions
|
Highway 11
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Simcoe County Road 20, Oro Line 11 Underpass, 800 metres South of the intersection of Highway 11 and Oro Line 11 to 900 metres North of the intersection of Highway 11 and Oro Line 11 in the Township of Oro-Medonte within the County of Simcoe. Orillian Township Road Underpass, 100 metres North of the intersection of Highway 11 and Telford Line to 550 metres North of the intersection of Highway 11 and Big Chief Road in the Township of Severn within the Count of Simcoe. Underpass to be closed from June 12 to October 26, 2018. No height, width, and speed restrictions. October 19, 2018 - October 26, 2018
|
2018-05-11 04:00:00
|
2018-10-19 16:00:02
|
2018-05-11 04:00:00
|
2019-08-30 04:00:00
|
No Data
|
POINT (-79.410794 44.670577)
|
roadwork
|
|
MTO-constructions--2015-2028-483967230
|
MTO-constructions
|
Highway 403
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 403 / Desjardins Canal Bridge. Westbound and Eastbound Closure - (All Week) = Lane 1 and Lane 2 alternating single lane closure: 22:00 - 05:00. No Reduction in Speed Limits. October 19, 2018 - October 26, 2018
|
2016-05-04 04:00:00
|
2018-10-19 16:00:02
|
2016-05-04 04:00:00
|
2018-11-19 05:00:00
|
No Data
|
POINT (-79.89226 43.280215)
|
roadwork
|
|
MTO-constructions--2017-3013-777990016
|
MTO-constructions
|
Highway 85
|
Northbound/All Directions
|
There is no impact on traffic. Kitchener: From Victoria Street Northerly to Guelph Street Including Victoria Street Widening. Traffic impacts: Ramps closed until approximately November 2018. Bruce St. to northbound Highway 85 on Ramp Southbound Highway 85 to Edna St. off Ramp Eastbound Wellington St. to Highway 85 southbound on Ramp Victoria St./Highway 7 Bridge ( from Victoria St. East of Edna Street to Bruce Street) is closed approximately until December 2018. Effective Width Guelph St. Overpass: South Bound Core: 8 metres. South Bound Collector:4.3 North Bound Core: 8 metres North Bound Collector: Collectors 3.75 General Stage 2 and 4 Effective Widths: South & North Bound Core: 8.00 metres South & North Bound Collector: 4.50 metres. Reduced Height 4.5 metres minimum vertical construction clearance at (site 33-235) Victoria St. Underpass. October 19, 2018 - October 26, 2018
|
2018-01-15 05:00:00
|
2018-10-19 16:00:02
|
2018-01-15 05:00:00
|
2018-11-16 05:00:00
|
No Data
|
POINT (-80.471106 43.464363)
|
roadwork
|
|
MTO-constructions--2017-3012-859601560
|
MTO-constructions
|
Highway 3
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Big Otter Creek Structure, 0.5 kilometres West of the west limit of the Big Otter Creek Bridge, in the Town of Tillsonburg, in the County of Oxford to 0.5 kilometres East of the east limit of the Big Otter Creek Bridge. Stage 2 - Single lane configuration with temporary concrete barrier over Big Otter Creek Structure controlled by temporary traffic signals. Speed reduction 60 kilometres per hour in construction zone. Width 4.0 metres. No height restriction. Night Closures Possible. October 19, 2018 - October 26, 2018
|
2018-04-03 04:00:00
|
2018-10-19 16:00:02
|
2018-04-03 04:00:00
|
2018-12-07 05:00:00
|
No Data
|
POINT (-80.731533 42.848354)
|
roadwork
|
|
MTO-constructions--2016-4002-623315586
|
MTO-constructions
|
Highway 15
|
Both Directions
|
Expect delays up to 10 minutes. Highway 15 - from 1.2 kilometres south of Middle Road to 1.2 kilometres north of Station Road Traffic may encounter daily and nightly single lane closures. Speeds reduced to 60 kilometres per hour. October 19, 2018 - October 26, 2018
|
2017-05-01 04:00:00
|
2018-10-19 16:00:02
|
2017-05-01 04:00:00
|
2020-07-08 04:00:00
|
No Data
|
POINT (-76.429805 44.289016)
|
roadwork
|
|
MTO-constructions--2017-6029-1116857498
|
MTO-constructions
|
Highway 11
|
COMBINED
|
Expect delays up to 10 minutes. From Highway 11/17 Westerly for 58.2 kilometres. Traffic Control Person at various locations. Effective width of 3.8 metres October 19, 2018 - October 26, 2018
|
2018-05-13 04:00:00
|
2018-10-19 16:00:02
|
2018-05-13 04:00:00
|
2018-12-31 05:00:00
|
No Data
|
POINT (-89.896807 48.601419)
|
roadwork
|
|
MTO-constructions--2017-2030-831532649
|
MTO-constructions
|
Highway 401
|
Northbound/All Directions
|
Expect delays up to 15 minutes. Highway 401 Westbound Collector from East of Allen Road to East of Jane Street and Allen Road Interchange; 5.4 kilometres. Nightly full closure of Ramp Allen Road Northbound to 401 Westbound Collectors, October 15 to October 19, 10pm to 5:30am. Nightly full closure of Ramp Allen Road Southbound to 401 Eastbound Collectors, October 15 to October 19, 10pm to 5:30am. Nightly full closure of Ramp Allen Road Southbound to 401 Westbound Collectors, October 15 to October 19, 10pm to 5:30am. Nightly full closure of Ramp Yorkdale Road to 401 Eastbound Collectors, October 15 to October 19, 10pm to 5:30am. Nightly full closure of Ramp Yorkdale Road to Allen Road Northbound, October 15 to October 19, 10pm to 5:30am. Nightly full closure of Ramp 401 Westbound Collectors to Yorkdale Road, October 15 to October 19, 10pm to 5:30am. October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2021-07-02 04:00:00
|
No Data
|
POINT (-79.448805 43.730016)
|
roadwork
|
|
MTO-constructions--2017-2032-542801622
|
MTO-constructions
|
Highway 12
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Coldwater River Bridge, 600 metres West of the intersection of Highway 12 and Coldwater Road near the village of Coldwater, Township of Severn. Wye River Bridge Northbound and Southbound Lanes. Coldwater River Bridge Site: Temporary Concrete Barriers and Temporary Traffic Signals in place, reduced to one lane of traffic until October 26, 2018. Lane width of 3.75 metres. Speeds reduced to 60 kilometres per hour. No height reductions. Wye River Bridge Site: One lane closure in each direction until November 30, 2018. Temporary Concrete Barriers and Temporary Traffic Signals in place, lane width reduced to 3.75 metres. Bridge traffic reduced to two lanes, one eastbound and one westbound. Speeds reduced to 60 kilometres per hour. No height reductions. October 19, 2018 - October 26, 2018
|
2018-03-27 04:00:00
|
2018-10-19 16:00:02
|
2018-03-27 04:00:00
|
2019-11-01 04:00:00
|
No Data
|
POINT (-79.642599 44.699152)
|
roadwork
|
|
MTO-constructions--2014-2002-936425095
|
MTO-constructions
|
Highway 401
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 401 East Bound and West Bound lanes from 600 metres east of Appleby Line to 500 metres West of the Guelph Junction Railway Overpass. There are 2 tentatively scheduled night closures anticipated for next week for lane 1 only (period of October 22-28, 2018) between 10:00 pm to 5:00 am in the Highway 401 Eastbound direction and between 10:00pm to 6:00am in the Highway 401 Westbound direction between Highway 6 to Guelph Line to perform routing and sealing and rumble strip works. October 19, 2018 - October 26, 2018
|
2015-03-18 04:00:00
|
2018-10-19 16:00:02
|
2015-03-18 04:00:00
|
2018-11-30 05:00:00
|
No Data
|
POINT (-79.956531 43.504315)
|
roadwork
|
|
MTO-constructions--2016-6256-1402269200
|
MTO-constructions
|
Highway 11
|
Northbound/All Directions
|
Expect delays up to 5 minutes. On Highway 11, Dilke Creek #1 Culvert and Ramsdale Creek Culvert. Reduced to single lane controlled by traffic signals. Speed limit reduced to 70 kilometres per hour. Effective lane width of 4.0 metres. Height reduced to 5.0 metres. October 19, 2018 - October 26, 2018
|
2017-05-23 04:00:00
|
2018-10-19 16:00:02
|
2017-05-23 04:00:00
|
2018-10-26 04:00:00
|
No Data
|
POINT (-93.827451 48.633845)
|
roadwork
|
|
MTO-constructions--2016-5127-1855455216
|
MTO-constructions
|
Highway 11
|
Northbound/All Directions
|
Expect delays up to 15 minutes. Highway 11 Nagagami and Shekak River Bridges. Traffic may be reduced to one lane controlled by traffic control persons. Speed may be reduced to 70 kilometres per hour during daylight hours. Traffic is on new alignment at Shekak and Nagagami sites. October 19, 2018 - October 26, 2018
|
2016-06-29 04:00:00
|
2018-10-19 16:00:02
|
2016-06-29 04:00:00
|
2018-10-19 04:00:00
|
No Data
|
POINT (-84.536866 49.772125)
|
roadwork
|
|
MTO-constructions--2017-4046-18516660
|
MTO-constructions
|
Highway 401
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Highway 401 - Brandon Creek Bridges - from 2.0 kilometres east of to 2.0 kilometres west of Brandon Creek. Traffic will encounter nightly single lane and shoulder closures. Speeds reduced to 80 kilometres per hour. Effective width 4.0 metres. Lane shift both directions. October 19, 2018 - October 26, 2018
|
2018-02-05 05:00:00
|
2018-10-19 16:00:02
|
2018-02-05 05:00:00
|
2018-12-21 05:00:00
|
No Data
|
POINT (-76.869776 44.275653)
|
roadwork
|
|
MTO-constructions--2017-5107-1135837353
|
MTO-constructions
|
Highway 69
|
Southbound
|
There is no impact on traffic. Still River Bridge, Henvey Township. Highway 69 at Still River bridge reduced to single lane for short durations, flagging at site . Reduced speed from 90 kilometers per hour to 70 kilometers per hour. Effective width lane and shoulder 5.75 metres. October 19, 2018 - October 26, 2018
|
2017-06-05 04:00:00
|
2018-10-19 16:00:02
|
2017-06-05 04:00:00
|
2018-11-20 05:00:00
|
No Data
|
POINT (-80.53644 45.800882)
|
roadwork
|
|
MTO-constructions--2017-2042-385799087
|
MTO-constructions
|
Highway 48
|
COMBINED
|
There is no impact on traffic. Highway 48/Bloomington Road Intersection. The Week of Oct. 15 to 21 2018. 1) A full closure of Hwy 48/Bloomington Intersection will be in place from Friday October 19th at 22:00 to Saturday October 20th at 06:00. 2) A partial closure will be in place from Saturday October 20th at 06:00 until Sunday October 21st at 23:59. During this partial closure cars will only be allowed to travel through the intersection going east and west on Bloomington Rd. 3) A Full closure of Hwy 48/Bloomington Intersection will be in place from Sunday October 21 at midnight 00:00 until Monday October 22 at 05:00. 4)Monday October 22 at 05:00 the one lane roundabout will be opened. Partial Closure Highway 48 Northbound Closure (Through) D1 goes West on Stouffville Road Highway 48 Southbound Closure (Through) D2 goes West on Aurora Road Bloomington Road Westbound (Through) D3 goes North on York Durham Line Highway 48 Southbound Closure (Left Turn) D4 goes East on Aurora Road Bloomington Road Eastbound (Through) D5 goes East at Main Street Stouffville Bloomington Road Westbound Closure (Left Turn) D6 goes South at Ninth Line Full Closure Highway 48 Northbound Closure (Through) D1 goes West on Stouffville Road. Highway 48 Southbound Closure (Through) D2 goes West on Aurora Road Bloomington Road Westbound (Through) D3 goes North on York Durham Line Highway 48 Southbound Closure (Left Turn) D4 goes East on Aurora Road Bloomington Road Eastbound (Through) D5 goes East at Main Street Stouffville Bloomington Road Westbound Closure (Left Turn) D6 goes South at Ninth Line" October 19, 2018 - October 26, 2018
|
2018-05-10 04:00:00
|
2018-10-19 16:00:02
|
2018-05-10 04:00:00
|
2018-10-26 04:00:00
|
No Data
|
POINT (-79.289008 44.000852)
|
roadwork
|
|
MTO-constructions--2015-4013-447288128
|
MTO-constructions
|
Highway 7
|
Eastbound
|
Expect delays up to 5 minutes. Highway 7/115 Eastbound - from 1.5 kilometres west of to 3.75 kilometres east of Otonabee River Bridge. Traffic will encounter long duration eastbound right lane closure at Otonabee River Bridge. Speeds reduced to 80 kilometres per hour. Effective width 3.25 metres, controlled by temporary concrete barriers until December 31, 2018. October 19, 2018 - October 26, 2018
|
2015-08-19 04:00:00
|
2018-10-19 16:00:02
|
2015-08-19 04:00:00
|
2018-12-31 05:00:00
|
No Data
|
POINT (-78.323509 44.272234)
|
roadwork
|
|
MTO-constructions--2017-5135-687468615
|
MTO-constructions
|
522
|
Expect delays up to 5 minutes. Highway 522/522B, From McFadden Line, 0.4 kilometres West of Highway 11/522 Interchange Northerly to McCarthy Street, 0.45 kilometres West of Highway 11/522B Interchange. Length 4.5 kilometres Highway closed at bridge location. For access to Highway 522B use exit 306. No speed reduction at this time. Effective lane width 4 metres, shoulder ranging 2.5 to 3.0 metres October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-79.359705 45.978696)
|
roadwork
|
||
MTO-constructions--2017-4017-226410630
|
MTO-constructions
|
Highway 401
|
Both Directions
|
Expect delays up to 10 minutes. Highway 401 - from 1.5 kilometres west of Mallorytown Road (Interchange 675) to 1.5 kilometres east of Maitland Road (Interchange 705). Traffic will encounter single lane and shoulder closures. Speeds reduced to 80 kilometres per hour. Effective width 4.75 metres. October 19, 2018 - October 26, 2018
|
2017-07-31 04:00:00
|
2018-10-19 16:00:02
|
2017-07-31 04:00:00
|
2018-11-30 05:00:00
|
No Data
|
POINT (-75.625995 44.652947)
|
roadwork
|
|
MTO-constructions--2017-2034-277569362
|
MTO-constructions
|
Highway 401
|
Westbound
|
Expect delays up to 10 minutes. Highway 404/401 Interchange, Highway 401 Underpass Site. Highway 401 Westbound Express from 500 metres east of Warden Avenue to 600 metres west of Bayview Avenue. The following will be in place until November 30th, 2018: 1) Highway 401 westbound off ramp to Highway 404 southbound Don Valley Parkway reduced to one lane, 2) Full closure of Highway 404 southbound collector to express transfer lane south of Sheppard Avenue, and 3) Highway 401 westbound to Highway 404 southbound ramp reduced from two lanes to one lane. Recurring full closures will occur Tuesday to Friday from 11:00 pm to 5:00 am and Saturday from 11:0 pm to 9:00 am. 1)off ramp from Highway 401 westbound collector to Highway 404 southbound, lane affected, full 1 of 1. 2) off ramp from Highway 401 westbound express to Highway 404 southbound, lanes affected, full 2 out of 2. Recurring full closures will occur Tuesday to Friday from 10:00 pm to 5:00 am and Saturday from 11:00 pm to 9:00 am. 1) Highway 401 westbound transfer from Warden Ave collector to express, lanes affected: full 2 out of 2. 2) Highway 401 westbound express from Brimley Road to express at Highway 404 express, lanes affected: full 3 out of 3. October 19, 2018 - October 26, 2018
|
2018-04-26 04:00:00
|
2018-10-19 16:00:02
|
2018-04-26 04:00:00
|
2019-10-25 04:00:00
|
No Data
|
POINT (-79.338 43.767657)
|
roadwork
|
|
MTO-constructions--2017-3018-574950912
|
MTO-constructions
|
Highway 9
|
Northbound/All Directions
|
Expect delays up to 15 minutes. Highway 9 - Teeswater River Bridge (Site 2-256) Eastbound/ Westbound. From 320 metre West of the intersection of Union Street and Highway 9 to 530 metre East of the intersection of Union Street and Highway 9 in the Town of South Bruce Peninsula in the County of Bruce. As of March 12, 2018 on Highway 9 from 1 kilometre East of Teeswater River Bridge to 1 kilometre west of the same bridge alternating lane closure has been applied. Reduced Speed to 70 Kilometres per hour is required. Minimum Lane width 3.5 metres and shoulder width is 0.5 metres. Total Minimum width is 4.2 metres. As of April 6, 2018 Portable Temporary Traffic Signals (PTTS) and Traffic Control Barriers (Concrete medians) have been installed and activated on Teeswater Structure. As of July 9, 2018 Eastbound lane will be opened to the traffic and Westbound Lane will be closed for construction. Traffic on both directions will be managed by traffic signals. October 19, 2018 - October 26, 2018
|
2018-02-14 05:00:00
|
2018-10-19 16:00:02
|
2018-02-14 05:00:00
|
2019-05-07 04:00:00
|
No Data
|
POINT (-81.334769 44.089156)
|
roadwork
|
|
MTO-constructions--2017-5131-444564207
|
MTO-constructions
|
Highway 64
|
COMBINED
|
Expect delays up to 5 minutes. From 500 metres east of Highway 69 to Highway 528 including Little French River Culvert, Wolf River Culvert located 3.1 kilometres north of Highway 528 & Riberdy Tributary Culvert located 6.1 kilometres south of Highway 17. Temporary lane closure with advisory speed reduction to 60 kilometres per hour at Little French River Culvert with day time lane width available 4.04 metres, open to two lanes at the end of the day. One lane full closure at Wolf River Culvert open lane is controlled by Temporary Traffic Signals, lane width available 3.5 metres. Full depth removal of bitumious material with temporary lane closure operations controlled by flag persons during the day and open to lanes at night. Paving operation with temporary lane closure operations controlled by flag persons during the day and open to two lanes at night. Curb and Gutter removal and replacement in Alban temporary lane closure operations controlled by flag persons during the day and open to two lanes at night. October 19, 2018 - October 26, 2018
|
2018-05-02 04:00:00
|
2018-10-19 16:00:02
|
2018-05-02 04:00:00
|
2018-11-16 05:00:00
|
No Data
|
POINT (-80.666745 46.104641)
|
roadwork
|
|
MTO-constructions--2017-3028-588915477
|
MTO-constructions
|
Highway 402
|
Northbound/All Directions
|
Expect delays up to 15 minutes. Kerwood Road, School Road and Seed Road underpasses. Highway 402 will have daily lane and shoulder closures; No Speed Reductions; No Horizontal width restriction. Kerwood Road Underpass will have daily lane closures for Structure Rehabilitation; No Speed Reductions; Horizontal Width Restriction on 6.90 metres. School Road underpass will be fully closed. No lane reductions, no speed reductions. Kerwood road underpass will have intermittent 15 minute full closures between 22:00 and 06:00 Wednesday October 10, 2018. October 19, 2018 - October 26, 2018
|
2018-04-10 04:00:00
|
2018-10-19 16:00:02
|
2018-04-10 04:00:00
|
2019-08-23 04:00:00
|
No Data
|
POINT (-81.630693 42.992609)
|
roadwork
|
|
MTO-constructions--2017-5107-1191850821
|
MTO-constructions
|
Highway 526
|
COMBINED
|
There is no impact on traffic. Highway 526 from Highway 69 to town of Britt, Henvey Township to Wallbridge Township. Reduced to single lane short duration with traffic control persons. Reduced speed from 60 kilometres per hour to 50 kilometres per hour. Effective width 3.5 metre (lane and shoulder) No reduced height. October 19, 2018 - October 26, 2018
|
2017-06-05 04:00:00
|
2018-10-19 16:00:02
|
2017-06-05 04:00:00
|
2018-11-20 05:00:00
|
No Data
|
POINT (-80.53781 45.803308)
|
roadwork
|
|
MTO-constructions--2017-4013-605122376
|
MTO-constructions
|
33
|
COMBINED
|
Expect delays up to 60 minutes. Highway 33 - from 500 metres east of County Road 4 to 500 metres west of Collins Bay Road. Traffic will encounter daily single lane closures with flagging and a pace vehicle. Speeds reduced to 60 kilometres per hour during flagging operations. Effective width 4.0 metres. October 19, 2018 - October 26, 2018
|
2017-11-06 05:00:00
|
2018-10-19 16:00:02
|
2017-11-06 05:00:00
|
2019-06-14 04:00:00
|
No Data
|
POINT (-76.609291 44.241715)
|
roadwork
|
|
MTO-constructions--2018-6006-424187197
|
MTO-constructions
|
664
|
Northbound/All Directions
|
Expect delays up to 15 minutes. Sam Lake Culvert from 2.7 West of Highway 72 to 6.7 kilometres West of Highway 72 Speed limit reduced to 50 kilometres per hour. Effective lane width of 3.8 metres. October 19, 2018 - October 26, 2018
|
2018-05-07 04:00:00
|
2018-10-19 16:00:02
|
2018-05-07 04:00:00
|
2018-10-26 04:00:00
|
No Data
|
POINT (-92.029125 50.078111)
|
roadwork
|
|
MTO-constructions--2018-5103-1248448187
|
MTO-constructions
|
7188
|
COMBINED
|
Expect delays up to 5 minutes. Highway 7188/Katrine Road from Magview Drive to Tower Road. Traffic staging - Single lane closures. Effective lane width 4 metres, shoulder ranging from 2.0 metres October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-79.388453 45.603207)
|
roadwork
|
|
MTO-constructions--2017-6033-138224295
|
MTO-constructions
|
Highway 17
|
COMBINED
|
Expect delays up to 5 minutes. 3.36 kilometres West of Highway 622, Westerly for 3 kilometres and from 11.1 kilometres West of Highway 622, Westerly for 0.2 kilometres. Advisory 70 kilometres per hour signs are installed at the East tie in location on various occasions when work is being done in that area. October 19, 2018 - October 26, 2018
|
2018-04-23 04:00:00
|
2018-10-19 16:00:02
|
2018-04-23 04:00:00
|
2018-11-30 05:00:00
|
No Data
|
POINT (-92.090412 49.52272)
|
roadwork
|
|
MTO-constructions--2017-6039-260693429
|
MTO-constructions
|
643
|
COMBINED
|
Expect delays up to 5 minutes. From Highway 584 Westerly for 19.6 kilometres to Cavell and Anaconda Roads Reduced to single lane. Effective lane width of 3.25 metres. October 19, 2018 - October 26, 2018
|
2018-05-24 04:00:00
|
2018-10-19 16:00:02
|
2018-05-24 04:00:00
|
2019-06-05 04:00:00
|
No Data
|
POINT (-86.793875 50.170659)
|
roadwork
|
|
MTO-constructions--2018-2001-955998229
|
MTO-constructions
|
Queen Elizabeth Way
|
Northbound/All Directions
|
There is no impact on traffic. QEW Toronto Bound from 0.74 kilometre west of Dixie Road to Gardiner Expressway West Bound 0.70 kilometre east of Kipling Avenue. Weekly night lane closures QEW Eastbound Monday to Thursday from 10:00 p.m. to 5:00 a.m.; Friday from 11:00 p.m. to 7:00 a.m. and QEW Westbound Monday to Thursday from 11:00 p.m. to 6:00 a.m.; and Friday from midnight to 8:00 a.m. Weekly night Full Ramp closure QEW West to The West Mall North Monday to Thursday from 11:00 p.m. to 5:30 a.m. and Friday from 10:00 p.m to 6:00 a.m. Weekly night Full Ramp closure The West Mall North to QEW West from 11:00 p.m. to 5:00 a.m., Saturday opening at 6:00 a.m. Ramp South Service Road West to QEW East full ramp closure Monday to Thursday from 11:00 p.m. to 5:30 a.m. and Friday from 10:00 p.m. to 6:00 a.m. Ramp QEW East to North Service Road West full ramp closure Monday to Thursday from 11:00 p.m. to 5:30 a.m. and Friday from 10:00 p.m. to 6:00 a.m. Ramp Highway 427 Express North to QEW West full ramp closure Monday to Thursday from 11:00 p.m. to 5:00 a.m. and Friday from 11:00 p.m. to 6:00 a.m. October 19, 2018 - October 26, 2018
|
2018-09-17 04:00:00
|
2018-10-19 16:00:02
|
2018-09-17 04:00:00
|
2021-08-19 04:00:00
|
No Data
|
POINT (-79.559524 43.604894)
|
roadwork
|
|
MTO-constructions--2017-6028-509162207
|
MTO-constructions
|
Highway 11
|
Northbound/All Directions
|
Expect delays up to 15 minutes. 20.1 kilometres north Highway 11/17 (Nipigon junction) or 35.0 kilometres south of Macdiarmid Road Traffic reduced to single lane. Speed limit reduced to 60 kilometres per hour. Effective lane width of 4.5 metres. October 19, 2018 - October 26, 2018
|
2018-05-03 04:00:00
|
2018-10-19 16:00:02
|
2018-05-03 04:00:00
|
2018-09-27 04:00:00
|
No Data
|
POINT (-88.231179 49.167426)
|
roadwork
|
|
MTO-constructions--2014-2026-544084723
|
MTO-constructions
|
Highway 410
|
COMBINED
|
There is no impact on traffic. Highway 410 and 403. Please refer to the URL to the MTO Contract 2014-2026 project-specific website: www.my410.ca for any closure information. October 19, 2018 - October 26, 2018
|
2014-08-18 04:00:00
|
2018-10-19 16:00:02
|
2014-08-18 04:00:00
|
2018-11-16 05:00:00
|
No Data
|
POINT (-79.660232 43.639337)
|
roadwork
|
|
MTO-constructions--2017-6036-2118469816
|
MTO-constructions
|
Highway 599
|
Northbound/All Directions
|
Expect delays up to 5 minutes. Three locations on Highway 599, 2.3 kilometres, 4.0 kilometres and 7.2 kilometres North of Highway 17. Speed limit reduced to 60 kilometres per hour. October 19, 2018 - October 26, 2018
|
2018-05-09 04:00:00
|
2018-10-19 16:00:02
|
2018-05-09 04:00:00
|
2018-11-02 04:00:00
|
No Data
|
POINT (-91.625178 49.424772)
|
roadwork
|
|
MTO-constructions--2018-5103-1486813532
|
MTO-constructions
|
7162
|
COMBINED
|
Expect delays up to 5 minutes. Highway 520 from Ontario Street Westerly for 1.2 kilometres, Highway 520 from 300 metres North of Highway 11/520 Interchange Northerly for 1.0 kilometres, Highway 7162 from Highway 520 Northerly for 0.35 kilometres, Highway 7188/Katrine Road from Magview Drive to Tower Road. Traffic staging - Single lane closures. Effective lane width 4 metres, shoulder ranging from 2.0 metres. October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (0 0)
|
roadwork
|
|
MTO-constructions--2018-5107-1591066991
|
MTO-constructions
|
Highway 11
|
COMBINED
|
Expect delays up to 5 minutes. From 2.0 kilometres North of the North Highway 124 Interchange, Northerly to 1.0 kilometre South of the McFadden Line Interchange. Diversion of northbound traffic into southbound via constructed crossover. Effective lane width 4 metres with shoulder ranging 2.5 to 3.0 metres, speed reduction to 80 kilometres per hour. October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2019-08-16 04:00:00
|
No Data
|
POINT (-79.371329 45.900011)
|
roadwork
|
|
MTO-constructions--2018-5103-1482035327
|
MTO-constructions
|
520
|
COMBINED
|
Expect delays up to 5 minutes. Highway 520 from Ontario Street Westerly for 1.2 kilometres, Highway 520 from 300 metres North of Highway 11/520 Interchange Northerly for 1.0 kilometres, Highway 7162 from Highway 520 Northerly for 0.35 kilometres, Highway 7188/Katrine Road from Magview Drive to Tower Road. Traffic staging - Single lane closures. Effective lane width 4 metres, shoulder ranging from 2.5 to 3.0 metres. October 19, 2018 - October 26, 2018
|
2018-05-28 04:00:00
|
2018-10-19 16:00:02
|
2018-05-28 04:00:00
|
2018-10-31 04:00:00
|
No Data
|
POINT (-79.410421 45.623311)
|
roadwork
|
|
MTO-constructions--2017-2038-1127439053
|
MTO-constructions
|
Highway 401
|
Westbound
|
Expect delays up to 30 minutes. Highway 401 and Brock Street Interchange project from West of Harwood to East of Thickson Road. Eastbound 401 The following recurring nightly closures may be in place: 1) Highway 401 Eastbound 1 lane closed from 9 PM to 6 AM; 2 lanes closed from 11 pm to 6 AM, 2) Ramp from Highway 401 Eastbound to Brock Street Northbound/Southbound from 10 pm to 6 AM, and 3) Ramp from Brock Street Northbound/Southbound to Highway 401 Eastbound fully closed from 11:59 PM to 6 AM, 4) Two Lanes Off-Ramps from Stevenson Road to Thickson Road fully closed from 11:59 PM to 5 AM, 5) One-lane On and Off Ramps from Stevenson Road and Thickson Road closed 11:59 PM to 5:00 AM. Westbound 401 The following recurring nightly closures may be in place: 1) Highway 401 Westbound 1 lane closed from 8 PM to 5 AM; except (Sunday & Friday 9 PM to 5AM); 2 lanes closed from 11 pm to 5 AM, and 2) Ramp from Brock Street Southbound to Highway 401 Westbound from 9:00 PM to 5:30 AM (except on Sun closed 10 PM to 9AM). Highway 401 Westbound to Consumers Drive East/West and Consumers Drive East/West to Highway 401 Westbound Ramps will remain open this period. October 19, 2018 - October 26, 2018
|
2018-05-11 04:00:00
|
2018-10-19 16:00:02
|
2018-05-11 04:00:00
|
2020-10-30 04:00:00
|
No Data
|
POINT (-78.936316 43.866305)
|
roadwork
|
|
MTO-constructions--2018-5115-860704062
|
MTO-constructions
|
65
|
Expect delays up to 10 minutes. On highway 65 at the Wright Creek Bridge 20.4 kilometres east of the Junction of highway 11 at New Liskeard. Reduced speed to 60 kilometres per hour through work zone. Eastbound and Westbound lanes are open for traffic over the structure. October 19, 2018 - October 26, 2018
|
2018-07-09 04:00:00
|
2018-10-19 16:00:02
|
2018-07-09 04:00:00
|
2018-11-02 04:00:00
|
No Data
|
POINT (-79.538454 47.609813)
|
roadwork
|
Namara offers a connection to over 250K data feeds from every industry and the tools to drive value and insight.
Request access Report problem